Storm Sewer Under Construction


The Glencoe storm sewer project is under way

The Glencoe storm sewer project is under way, with the Elbow Drive crossing now complete. This narrowed Elbow Drive for quite some time. The construction on the sewer
into the Elbow River is underway also. The large ditch in Woods Park will contain the outfall which will be an attractive, environmentally safe structure. Sewer pipe will be laid up to Marquette and Premier this fall.

There was some flooding in Elbow Park this summer during some of the large rain storms we had. This new sewer pipe should alleviate these problems.

Posted: Sun - September 19, 2004 at 05:48 PM      


©